Posts

Showing posts from October, 2020

Linear Regression

Image
 

Schedule efficiency calculation

Image
 

AHT Trend using 6 weeks historical data

Image
                    Step 1:    We need to collect interval wise AHT and handled calls  by pulling historical data.         Step 2 : We need to determine Handled time(Calls*AHT) because taking average is not correct as per WFM.                                                                Setup 3:   AHT trend

Staff Scheduling process in detail

Image
Disclaimer:  The below data and formatting is just my assumption and it is not  related to any company . Step:1 We need to determine interval wise call arrival pattern based on trend, example: 6 weeks. Step:2 We need to determine  interval wise AHT based on trend, example: 6 weeks. Step:3 We need to determine  interval wise Shrinkage based on trend, example: 6 weeks. Step:4 We need to determine  interval wise staffing  based calls Arrival pattern, AHT and Service level. Step:5 We need to check the present headcount and schedule the agent by designing shift pattern

Basic and simple Capacity plan

Image
  Disclaimer:  The below data and formatting is just my assumption and it is not  related to any company .

WFM Analysis

Image
Disclaimer: The below data and formatting is just my assumption and it is not  related to any company .   Scenario: 1   Scenario: 2   Scenario: 3   Scenario: 4   Scenario: 5

Scheduling Process and Scheduled efficiency

Image
 

Determination of FTE using Erlang

Image
 

Introduction to Machine Learning (continuation)

Image
 

Introduction to Machine Learning

Image
 

Data science introduction

Image
 

Capacity planner thought process after reviewing the plan

Image

Understanding Occupancy

Image
 

Forecasting using Time series analysis

Image
  Time series Analysis: In order to do  forecasting,  we required historical data and it should be  arranged  in a proper manner based on the time period. After  that, the  next step to find the trend or change in the call volume compare to last year.  We  need to check whether  an increase  or decrease in the volume. Please find the below example for better understanding.

Forecasting Methods with the example

Image
 

Introduction to forecasting part 2

Image
 

Introduction to Forecasting

Image
 
Image
  I have very good working experience in Microsoft excel VBA and also in all the WFM domain,  created  many templates using excel VBA. I feel that Microsoft  excel  VBA or any other tools are not a rocket science.  So  follow my blog and I will make sure to bring everybody on  the same page         Mirza Taqi Ali       Microsoft    excel VBA    (Trainer)